|
|||||||||||
The Hydropower Project (HPP) Gojeb in Ethiopia consists of a 130 m high concrete faced rockfill dam (CFRD), a powerhouse with an installed power of 150 MW and a gated, open spillway on the right hand side.
A curved approach channel leads to an ogee weir with three radial gates, followed by a transition section contracting the channel width, an open chute (20 m wide and some 176.6 m long) and a flip bucket.
The performance of the spillway had to be verified. Therefore, a physical model with a scale of 1:55 was built.
For steady state conditions, the flow conditions in the approach channel, the discharge characteristics including the velocities of the spillway and corresponding pressures were assessed. Furthermore, qualitative aspects, such as shockwaves in the chute and the hydraulic jump in the adjoining flip bucket were investigated. Finally, scouring in the adjacent tailwater reach was documented and conclusions for adequate measures were drawn.
Only the gated outflow of small discharges (e.g. 359 m3/s) over the weir structure leads to pressures close to zero. Pressures close to vapor pressure were not observed in the hydraulic model. The absence of the danger of cavitation erosion at the ogee weir and in the chute is typical for all investigated cases. Maximum measured velocities at the end of the steep part were of 31 m/s with corresponding cavitation indices of approximately 0.3. Therefore, provision of aerators does not seem to be necessary.
The overall performance of the flip bucket is satisfactory. Issuing from the flip bucket, trajectories of floods higher than 1184 m3/s do not hit the original terrain. Jets hitting the actual river bed result in scour hole depths close to those estimated. The biggest hole occuring during the highest investigated discharge of 1725 m3/s is 31.6 m deep. Secondary currents, developing as rollers on each side of the jet’s impact area, cause additional scouring, and measures should be considered to protect the left valley flank against sliding.
| Keywords: | Cavitation, flip bucket, scour |
| Researcher: |
Gottfried Valentin |
| Commissioned by: | Lahmeyer International Ltd. |
| Project status: |
Completed 2002 |
Wichtiger Hinweis:
Diese Website wird in älteren Versionen von Netscape ohne
graphische Elemente dargestellt. Die Funktionalität der
Website ist aber trotzdem gewährleistet. Wenn Sie diese
Website regelmässig benutzen, empfehlen wir Ihnen, auf
Ihrem Computer einen aktuellen Browser zu installieren. Weitere
Informationen finden Sie auf
folgender
Seite.
Important Note:
The content in this site is accessible to any browser or
Internet device, however, some graphics will display correctly
only in the newer versions of Netscape. To get the most out of
our site we suggest you upgrade to a newer browser.
More
information