The bottom outlet of the Gojeb HPP consists of a headrace tunnel, a plug equipped with two sets of gates (one service and one emergency gate) and a tailrace tunnel of 274 m which is followed by a flip bucket adjacent to the tunnel portal.
Clear water discharges QW up to the maximum capacity, air discharges QA through the air supply system as well as the pressure head in the headrace tunnel, along the plug and in the tailrace tunnel were the focus points of the investigation. Furthermore scouring in the tailwater and various qualitative aspects of the flow in the tailrace tunnel were investigated.
The clear water discharge capacity reaching a maximum of 415 m3/s under PMF conditions (reservoir level at 1116 m asl, both gates fully opened) is slightly higher than calculated from the design. This trend is also valid for lower reservoir levels and smaller relative gate openings s.
The pressures measured in the headrace tunnel correspond directly to the reservoir level and the velocity of the clear water flow. The latter is of importance close to the gates as the discharged water passes the plug. While the discharge increases with a higher relative gate opening s, the pressures along the plug drop significantly.
Pressures in the tailrace tunnel are mainly governed by the processes of air entrainment and the air supply system. The latter being designed as to avoid headlosses in the system wherever possible, enough air can be fed into the tailrace tunnel without the pressure in the gate chamber being lowered down to dangerous values. In the layout tested in the model under steady state conditions, no negative pressures were measured.
The phenomenon of shockwaves was investigated qualitatively under steady state conditions too. By video recordings from the inside of the gate chamber it could be confirmed, that also the fiercest shockwaves leave a core big enough as to allow for sufficient air circulation through the tailrace tunnel.
Transient conditions in the tailrace tunnel were also investigated. Opening and closing procedures of the gates were executed under PMF conditions where the tailrace tunnel is submerged due to high tail water. The resulting hydraulic jump in the tailrace tunnel is completely pushed out of the bottom outlet as long as either one or both gates are opened continuously until full opening of the gates. The duration of this process is short enough as to allow for safe operation. Minimum gate openings for a complete push out of the hydraulic jump could be determined.
| Keywords: | Air-water flow, bottom outlet, gated high head flow |
| Researcher: |
Hansjürg Sigg |
| Commissioned by: | Lahmeyer International Ltd. |
| Project status: |
Completed 2002 |
Wichtiger Hinweis:
Diese Website wird in älteren Versionen von Netscape ohne
graphische Elemente dargestellt. Die Funktionalität der
Website ist aber trotzdem gewährleistet. Wenn Sie diese
Website regelmässig benutzen, empfehlen wir Ihnen, auf
Ihrem Computer einen aktuellen Browser zu installieren. Weitere
Informationen finden Sie auf
folgender
Seite.
Important Note:
The content in this site is accessible to any browser or
Internet device, however, some graphics will display correctly
only in the newer versions of Netscape. To get the most out of
our site we suggest you upgrade to a newer browser.
More
information