After the floods in 1910, the River Landquart between gorge “Klus” and the mouth in the Rhein-River was regulated. The 4.5 km long section was canalised and the bed was fixed with grade control structures (Fig. 1). River training works were applied in order to stop the enduring erosion process. In 1969 physical model tests were held to prove the sills which have been established to stabilise the river bed.
As less sills were realised than projected and due to a decrease of the bed-load transport, the process of erosion continuous. Following then the rip-rap foundations of the banks and the sills are at risk.
The intent concept for that river section of the Landquart-River plans to construct the block ramps by filling the scour hole immediately downstream the sills. Due to the high specific discharges (20 to 40 m2/s) the design of these structures is associated with major insecurities.
The purpose of present investigation is the assessment of feasibility for block ramps and the development of the required basics to design block ramps with allow the substitution of the sills.
| Keywords: | Erosion, Landquart, sill, block ramp, design criteria |
| Contacts: |
Nadia Semadeni |
| Commissioned by: |
Tiefbauamt des Kanton Graubündens |
Wichtiger Hinweis:
Diese Website wird in älteren Versionen von Netscape ohne
graphische Elemente dargestellt. Die Funktionalität der
Website ist aber trotzdem gewährleistet. Wenn Sie diese
Website regelmässig benutzen, empfehlen wir Ihnen, auf
Ihrem Computer einen aktuellen Browser zu installieren. Weitere
Informationen finden Sie auf
folgender
Seite.
Important Note:
The content in this site is accessible to any browser or
Internet device, however, some graphics will display correctly
only in the newer versions of Netscape. To get the most out of
our site we suggest you upgrade to a newer browser.
More
information