Nature oriented stream bed stabilization: Dala Leukerbad (VS)

The river bed of the Dala at Leukerbad (VS) was in a state of heavy degradation. The erosion in the late nineties reached a critical extent regarding embankment stability, so landslides with debris flows and inundation consequences could not be excluded any more. Due to this danger, the canton Valais commissioned a restoration project. The fluvial engineering office Hunziker & Zarn in Aarau suggested two variants with a series of check dams or long block ramps, respectively. Designed in an appropriate way, these variants represent stream bed stabilization measures, which are closer to a natural mountain stream than other custom solutions.

Flume experiments were carried out at the VAW in order to test the design of two sections with a typical step-pool morphology with an averaged slope of 8%. The existent bed material (d90 = 0.4 m) was additionally stabilized with several heavy blocks (block diameter = 1-1.4 m and block placement density = 0.35 blocks/m2) in different arrangements. The so prepared stream bed was then impinged gradually on to the design discharge of 42 m3/s.

Five runs with different arrangement of the blocks were carried out. A strong restructuring of the blocks and the subjacent bed material was observed between discharges of 36 and 42 m3/s, depending on the arrangement. This global restructuring of the stream bed led to a rougher and more stable bed structure, which corresponds to the aspired natural mountain stream morphology. The block placement density of this new structure was more than 0.4 blocks/m2. The restructuring, however, was accompanied by a considerable mass loss in the upper flume section. For safety reasons this mass loss had to be avoided because in nature the accompanying depth erosion could endanger the stability of the embankments. Additionally blocks washed away by floods could lead to clogging of bridges downstream and so trigger inundations.

Therefore, in nature the resulted step and pool morphology had to be approximated already during the construction. Thus, most blocks were arranged in steps oriented transverse to flow direction with a distance of 7-9 m between each other. Additionally, a block placement density of about 0.4 blocks/m2 was aspired between the steps. This new bed stabilization withstood the flood event in October 2000 without any problems.

 

Keywords: Nature oriented bed stabilization, step- pool morphology, large roughness elements
Contacts: Dr. Christian Marti
Commissioned by: Dienststelle für Strassen- und Flussbau des Kantons Wallis
(Department of Road- and River Engineering of the canton Valais, Switzerland)

 

Wichtiger Hinweis:
Diese Website wird in älteren Versionen von Netscape ohne graphische Elemente dargestellt. Die Funktionalität der Website ist aber trotzdem gewährleistet. Wenn Sie diese Website regelmässig benutzen, empfehlen wir Ihnen, auf Ihrem Computer einen aktuellen Browser zu installieren. Weitere Informationen finden Sie auf
folgender Seite.

Important Note:
The content in this site is accessible to any browser or Internet device, however, some graphics will display correctly only in the newer versions of Netscape. To get the most out of our site we suggest you upgrade to a newer browser.
More information

© 2012 ETH Zurich | Imprint | Disclaimer | 4 November 2009