Flood protection “Urner Talboden”: Hydraulic scale model tests

During the flood event in August 2005 the valley of canton Uri was strongly affected by flooding. In the night of the 22nd August the river Schächen overtopped his banks and devastated the nearby industrial zone, the biggest of the canton. The total economic loss caused by the flood event amounted up to 300 million CHF. The river Schächen originates close to the Klausenpass and flows through the Schächen valley and meets the river Reuss at the valley bottom of Uri. The catchment area has a size of about 110 km2. In the alluvial fan the Schächen is routed in a prismatic, straight lined, fixed torrent channel to its confluence where it flows in a slight right hand bend into the Reuss. Several transportation routes of international importance cross the Schächen about 200 m upstream of the confluence.

The 2005 flood can be characterized with a very long period of high discharges. The discharge exceeded 100 m3/s (50-70-year flood) during 12 hours, causing an enormous bed load displacement due to distinct bank erosion and channel degradation. Because of the slope reduction, the sediment has initially been deposited in the confluence region propagating backwards into the Schächen. The progressing sediment deposition filled the upstream channel and finally the flow cross section under the bridges upstream of the confluence was blocked. This culvert blockage caused an enormous overbank flooding of water and bed load material.

After the devastating flood the canton of Uri commissioned a consortium of engineering companies to elaborate a flood protection project. The most significant measures, which are examined in the hydraulic model, are (1) the redesign of the bridges as a 45 m long bridge deck inducing pressurised flow conditions, (2) the construction of a lateral sediment retention basin, which is linked with the fixed torrent channel via a 240 m long side weir in the right channel bank and (3) to increase the bank height with hydraulic capacity of the channel. To analyze the impact of the different measures separately and in combination, hydraulic model tests have been conducted parallel to the project planning phase. The hydraulic model has been built on a 1:50 scale, representing 1100 m of the Schächen and 600 m of the Reuss to investigate possible backwater effects.

First technical expertises show that the planned bridge deck is able to induce pressurized-flow under the bridge during high load leading to a decreased blocking and flooding risk. The planned lateral sediment retention basin has a potential of retaining about 100’000 m3 of sediment during a design load (300-year flood), corresponding to 75% of the overall bedload.

 

Keywords: backward deposition, lateral sediment retention basin, bridge deck inducing pressurised flow conditions
Contacts: DMarius Junker
Commissioned by: Tiefbauamt Kanton Uri
 

Wichtiger Hinweis:
Diese Website wird in älteren Versionen von Netscape ohne graphische Elemente dargestellt. Die Funktionalität der Website ist aber trotzdem gewährleistet. Wenn Sie diese Website regelmässig benutzen, empfehlen wir Ihnen, auf Ihrem Computer einen aktuellen Browser zu installieren. Weitere Informationen finden Sie auf
folgender Seite.

Important Note:
The content in this site is accessible to any browser or Internet device, however, some graphics will display correctly only in the newer versions of Netscape. To get the most out of our site we suggest you upgrade to a newer browser.
More information

© 2012 ETH Zurich | Imprint | Disclaimer | 4 November 2009
top